Know what you're building, and what it costs, before you build it.

Most overruns start before the first line of code: a scope nobody wrote down, flows nobody walked through, an architecture chosen by accident. The sprint settles those first.

A good scope is the cheapest part of a software project and the one most often skipped. In the sprint we decide together what the first version has to do, what it can leave out, and how it should be built, so the quote that follows describes real work rather than a guess.

Who it's for

  • You have an idea or early designs and want a firm price before committing to a build.
  • You've had quotes that vary wildly and can't tell which one is realistic.
  • You need something concrete to share with co-founders or investors: what gets built, in what order, for how much.
  • You're not sure yet whether you need a new build or a fix to what you have.

What you get

  1. 01

    Scope

    What's in the first version, what waits, and why, written down.

  2. 02

    User flows

    The main journeys through the product

  3. 03

    Architecture outline

    Stack, data model, integrations and hosting, with the reasoning behind each choice.

  4. 04

    Key screens

    The screens that carry the product

  5. 05

    Costed build plan

    Milestones and a fixed quote for the build.

How it works

A fixed-price sprint that turns your idea into a plan, key screens and a quote you own.

  1. v0.1

    Kick-off

    Goals, users, constraints, and anything that already exists.

  2. v0.4

    Shape the scope

    Flows and the cut for the first version, reviewed with you.

  3. v0.6

    Design and architecture

    Key screens and the technical outline.

  4. v1.0

    Plan and quote

    Costed milestones and a fixed price for the build.

you own

The repository, hosting and accounts, from day one. If you ever want to work with someone else, nothing has to be handed back.

Questions

Do I have to build with you afterwards?

No. The plan, designs and documents are yours to take to any team. If you do build with us, the quote in the plan is the price of the build.

What does it cost?

The sprint has a fixed price, agreed before it starts, so you know the cost before you commit to anything.

What do you need from me?

Time for a few working sessions, and anything that already exists — notes, designs, a prototype, products you admire.

ready to ship

Tell us where your product is today.

Idea, prototype or live product. We'll tell you honestly what it needs next.

Start a project